Skip to main content

DEPARTMENT OF METEOROLOGY AND HYDROLOGY (MYANMAR)

 

  • Myanmar
  • English

Department of Meteorology and Hydrology

Main menu

  • Home
    • current weather condition of city(7-5-2026 )
  • Forecast
    • Daily Weather Forecast
    • 10 Days Weather Forecast
    • Monthly Weather Forecast
    • Daily Water Level Forecast
    • 10 Days Water Level Forecast
    • Monthly Water Level Forecast
    • (Early/Mid/Late)/Winter Monsoon Weather Forecast
    • (Early/Mid/Late)/Winter monsoon Water Level Forecast
    • Sea Route Forecast
    • 3 Days City Forecasts for Maximum, Minimum & Weather Forecast
    • City Weather Forecast for States and Regions
    • EL-nino/La-nina
    • WRF Model Outputs
  • Warning
    • Cyclone Warning
    • Flood Warning
    • Strong Wind Warning
    • Untimely Rainfall Warning
    • Minimum Alert Water Level
    • Tsunami Warning
    • Heavy Rainfall Warning
  • Bulletin
    • New Records
    • Flood Bulletin
    • Flash Flood Guidance Bulletin
    • Significant Water Level Bulletin
    • Minimum Water Level Bulletin
    • AGRO-MET Bulletin
    • Southwest Monsoon Condition
    • Temperature Outlook
    • Bay of Bengal Condition
    • Special Weather News
  • News
    • Cyclone News
    • Earthquake News
    • DMH News
    • Orther News
  • Image
    • MTSAT satellite image
    • Radar Image
  • About DMH
    • Brief History
    • Objectives
    • Organization Chart
    • Division
      • Meteorology
      • Hydrology
      • Seismology
      • Upper Myanmar
      • Lower Myanmar
      • Agro-Metegorology
      • Aviation Meteorology
      • Engineering
    • Trainings
    • International Cooperation
    • Multi-Hazard Early Warning Center
  • Natural Disaster
    • Earthquake
    • Meteorological Disaster
      • Cyclone
    • Tsunami
    • Disaster Risk Reduction
    • Flood
  • Public Education
    • Climate Change
    • Meteorology
    • Acid Deposition
    • Articles
    • Environmental Affairs
    • Remote Sensing and GIS
  • Contact Us

8-5-2026 Weather is partly cloudy to cloudy over the Andaman Sea and Bay of Bengal.

MTSAT Satellite

Severe Weather

EL-nino/La-nina

Flood

 

Cyclone

Rainfall

EARTHQUAKE

TSUNAMI

UV Index

၂၀၂၀ ပြည့်နှစ် အထွေထွေရွေးကောက်ပွဲတွင် စိစစ်တွေ့ရှိရသည့် “မဲမသမာမှုနှင့်တရားမဲ့ပြုကျင့်မှုများ"

Flood Bulletin

Sunday, July 30, 2023 - 10:45

  • Flood Bulletin Graph for Moekaung
English
Flood Bulletin

Radar Image

37.5°C NayPyiTaw

R E P O R T S

 

 

 

Daily Weather Forecast

10-Day/Farmer Weather Forecast

Monthly Weather Forecast

  • NMHSS
  • Regional City Weather
  • Glossary
  • Flash Flood Guidance Bulletin

   

Department of Meteorology and Hydrology (Myanmar)
Public weather call: 067-411252/01-667766